Location Date China 1475362800 Japan 1475276400 Uzbekistan 1388275200 South Korea 1376521200 Singapore 1376434800 Indonesia 1376434800 Malaysia 1376262000 Brunei 1375743600 Taiwan 1359936000 Philippines 1359590400 Vietnam 1328313600 Cambodia 1327708800 Thailand 1327363200 Hong Kong 1221951600 Pakistan 1193875200 Oman 1193180400 United Arab Emirates 1193007600 South Korea -
Location Date Incheon 1376521200 Danyang-Gun 1374879600 Habuk-Myeon 1372460400 Songnisan 1370041200 Kuryongpo 1369436400 Songgwangsa 1368831600 Namhae 1368831600 Unjusa 1368745200 Unmunsa 1368226800 Tongyeong 1367017200 Seoul 1358553600 Seonyudo-Ri 1348354800 Gunsan 1348268400 Yeosu 1339714800 Daegu 1339628400 Impo 1338937200 Suncheon 1338073200 Boseong-Gun 1337986800 Gwangju 1337900400 Pohang 1337382000 Ganghwado 1336777200 Gimhae 1333753200 Busan 1324944000 Chilgok 1317682800 Gongju 1317423600 Gohyeon 1307228400 Ulsan 1306537200 Seongsan Ichulbong 1304895600 Jungmun 1304809200 Seogwipo 1304722800 Jeju City 1304636400 Cheongdo 1302908400 Koryong 1302303600 Geojedo 1298073600 Buyeo 1287183600 Gyeongju 1286578800 Andong 1285974000 Panmunjom 1285455600 Suwon 1285282800 Jeonju 1282086000 Daegu -
02 May 2013
One Sunday morning I was woken up early by the sound of heavy machinery next to my bedroom wall. This continued all morning and when I went out to look they were excavating the empty space next to my building that had been used as a parking lot for residents.
They dug up the ground leaving the way for foundation work to continue later. I wasnt sure when they would be back to finish the job or if they would leave it like that.
The next day on Monday they came back and began hammering and banging away as construction work continued. This is right next to my bedroom wall and I was worried any excavation work this close may undermine my building and cause damage to my bedroom.
I am sleeping right against this wall so I didnt want my bed to fall into some sinkhole in the middle of the night. The banging and hammering continued daily as construction work continued.
I wanted to see how they install the underfloor heating but I only saw them pour cement for the ground floor foundation. They do not have basements in Korea and the ground floor is the foundation floor.
They began making walls with what I thought were cement blocks. These were in fact molding pads which would be used to hold the cement when it was poured in. They formed walls with these blocks and one morning a cement truck with a long nozzle came and poured cement into the empty spaces
Construction seemed to be going quite fast. My only issue is they work every Sunday starting from 6AM. I'm not sure what the laws are about hours and days of work but every Sunday after 6am I am woken up by banging and hammering right up against my bed.
Every day the workers see me coming and going, or throwing out trash, so they know a foreigner lives here. One day one walks right up to me and says "Bangladesh" to my face and walked away. I tried to explain in perfect Korean that I am from Canada but that my parents are from Pakistan.
He continued to walk to his van, get his tools, and wasnt listening. That was quite rude when you were the one that walked up to me and started the conversation with a statement to which you dont want to know the answer. Koreans are not usually rude like that.
Work has continued quite rapidly completing the shell for the four story building, filling in the cement blocks with permanent walls, adding window frames, and exterior tiling. The only nuisance is the constant weekend work at early hours, although it does help as an additional alarm on weekday morning.
They dug up the ground leaving the way for foundation work to continue later. I wasnt sure when they would be back to finish the job or if they would leave it like that.
The next day on Monday they came back and began hammering and banging away as construction work continued. This is right next to my bedroom wall and I was worried any excavation work this close may undermine my building and cause damage to my bedroom.
I am sleeping right against this wall so I didnt want my bed to fall into some sinkhole in the middle of the night. The banging and hammering continued daily as construction work continued.
I wanted to see how they install the underfloor heating but I only saw them pour cement for the ground floor foundation. They do not have basements in Korea and the ground floor is the foundation floor.
They began making walls with what I thought were cement blocks. These were in fact molding pads which would be used to hold the cement when it was poured in. They formed walls with these blocks and one morning a cement truck with a long nozzle came and poured cement into the empty spaces
Construction seemed to be going quite fast. My only issue is they work every Sunday starting from 6AM. I'm not sure what the laws are about hours and days of work but every Sunday after 6am I am woken up by banging and hammering right up against my bed.
Every day the workers see me coming and going, or throwing out trash, so they know a foreigner lives here. One day one walks right up to me and says "Bangladesh" to my face and walked away. I tried to explain in perfect Korean that I am from Canada but that my parents are from Pakistan.
He continued to walk to his van, get his tools, and wasnt listening. That was quite rude when you were the one that walked up to me and started the conversation with a statement to which you dont want to know the answer. Koreans are not usually rude like that.
Work has continued quite rapidly completing the shell for the four story building, filling in the cement blocks with permanent walls, adding window frames, and exterior tiling. The only nuisance is the constant weekend work at early hours, although it does help as an additional alarm on weekday morning.